First mission: Summary preliminary project:
The purpose of the preliminary design studies (APS) is:
• Define the functional program and the relationships between spaces;
• Specify the general composition in terms of plan and volume;
• Define the location of the project in the land as well as the orientation of the spaces;
• Establish a provisional estimate of the provisional cost of the work.
Second mission: Detailed preliminary design:
The purpose of the detailed preliminary design studies (APD) is to:
• Define the exterior aspect of the project and the exterior layout of the land;
• To determine the detailed surfaces of the elements of the project;
• Define construction principles and construction materials
Third mission: Execution file:
The execution file is done in coordination with the various stakeholders (Civil Engineer, Fluid Engineer, Electricity) and it includes all the details necessary for the construction of the project.